An innovative air-conditioning system with chilled beams was used in this building, and it is the world’s first application of this system in the Hilton Hotels. This system designed by the OPTIMAL Engineering company is characterised by extremely low noise levels, excellent energy efficiency and lower maintenance costs. Due to this and other advanced technologies, the building obtained the prestigious LEED Gold Certificate..
Project Details |
Investor / Client: S+B Gruppe |
Completion Date: 2014 |
Rozpočet: ... |
Team: Optimal |
Site: Wspólna 72, 00-687 Warszawa, Polsko |
Service: Design / Supervision / LEED Gold certified |
GFA (m2): 300 rooms |