The Ras Al Khair–Riyadh Water Transmission System is one of the largest transport systems for drinking water. It is a 72″ twin pipeline providing desalinated water produced on the East coast of Saudi Arabia to Riyadh High Point Terminal and on to various terminal stations inside the city. OPTIMAL provided HVAC design for various buildings in the pumping plant.
Project Details |
Investor / Client: ILF Consulting Engineers |
Completion Date: 2011-2013 |
Site: Saudi Arabia |
Service: HVAC and Controls design |
GFA (m2): 2700 |