In this warehouse with the size of two football fields, OPTIMAL Engineering designed and implemented technical systems including cooling installation maintaining a constant temperature for food products. The cooling system performance exceeds 1 MW.
Project Details |
Investor / Client: FM Logistic |
Completion Date: 2011 |
Site: FM Logistic Tuchoměřice, Czech Republic |
Service: Design / Construction |
GFA (m2): 16.900 m2 |