FM Logistic Tuchoměřice

In this warehouse with the size of two football fields, OPTIMAL Engineering designed and implemented technical systems including cooling installation maintaining a constant temperature for food products. The cooling system performance exceeds 1 MW.

1.png2.png3.png

Project Details
Investor / Client:   
FM Logistic
Completion Date: 
2011
Site: 
FM Logistic Tuchoměřice, Czech Republic
Service: 
Design / Construction
GFA (m2): 
16.900 m2
Optimal > References > Industrial buildings > FM Logistic Tuchoměřice