News

 
29.6.2022 LEED Platinum certification and WELL HS rating for a new landmark office building in Warsaw, Poland

Recently a new 27 storey building developed by S+B Gruppe achieved the LEED Platinum certification and the WELL Health&Safety rating, showing deep commitment to sustainable development by the whole project team. Only 5,6% of the total of 13 754 worldwide LEED certified buildings has reached the top Platinum level. more

23.11.2020 Air desinfection by UV-C as an anti-Covid measure

Our clients have been recently seeking advice about various anti-Covid strategies including UV-C air desinfection. We prepared for you a brief summary of available UV-C technologies and its application based on the ASHRAE knowledge. Should you have any questions about anti-Covid strategies for HVAC systems do not hesitate to ask OPTIMAL for consultation. more

25.7.2019 Retro-Commissioning: Significant Savings at Minimal Cost Improving the Performance of Buildings through Retro-commissioning

Retro-commissioning is a process to improve the efficiency of an existing building’s equipment and systems. It can often resolve problems that occurred during design or construction, or address problems that have developed throughout the building’s life as equipment has aged, or as building usage has changed. Retro-commissioning involves a systemic evaluation of opportunities to improve energy-using systems. If the same process were applied to a car, mechanics would make adjustments to the settings, controls, components and design of the engine based on how the owner actually drives. more

25.7.2019 Employees are Happier, Healthier and More Productive in LEED Green Buildings

According to a new survey released from the U.S. Green Building Council (USGBC), employees who work in LEED-certified green buildings are happier, healthier and more productive than employees in conventional and non-LEED buildings. more

25.7.2019 Šárecký dvůr won the Best Residential Development award

The Šárecký dvůr project won the prestigious European CIJ Awards competition in the category of the best residential development in the Czech Republic for 2018. The heart of the complex is the enclosed courtyard, which connects a Baroque building with 7 townhouses, newly built villa houses with 44 elegant apartments and a historic building with 5 studios. OPTIMAL Engineering completed construction of the heating and plumbing systems in the whole campus where accurate work and highest quality had to be implied. more

25.7.2019 LEED Platinum certification for two new buildings in Pankrac, Prague

At the end of last year and beginning of 2019 two new buildings developed by S+B Gruppe achieved the LEED certification. more

17.5.2018 TRIMARAN at Prague Pankrac sets sails

NEW OFFICE BUILDING WITH CONGRESS CENTRE, DEVELOPED BY S+B GRUPPE, WAS GRANTED THE OCCUPATION PERMIT. more

11.4.2018 ERA COMPANY HEADQUOTER IN PARDUBICE

NEW COMBINED OFFICE AND R&D CENTER OF ERA a.s. IN PARDUBICE WAS AWARDED TITLE "BUILDING OF THE YEAR OF THE PARDUBICE REGION 2017". WE ARE PROUD TO HAVE HELPED THIS SUCCESSFUL CONSTRUCTION AS THE VENTILATION AND AIR-CONDITIONING CONTRACTORS. more

Optimal > News